Let's Talk
Let's Talk

Boughton Heath Retirement Community

  • Client
    Retirement Villages Group / Thrive Living
  • Value
    €45,000,000

Through high performance construction materials, efficient heating and hot water generation via air source heat pump technology, renewable energy generation on site as well as offsetting carbon emissions, the buildings will achieve net zero carbon emissions when in use.

The Boughton Heath project consists of 155 apartments across 6 No new residential apartment blocks and focuses on community and the natural environment for its residents with a generous landscape design and amenity areas. A restaurant, café, wellness area on the grounds will be open to people from the surrounding area as well as residents.

The project is located adjacent to the Boughton Heath, Chester Park and Ride.

Block A – is a mixed-use block covering 4 levels. Level 00 is built up with Amenity area, cycle & buggy store, plant room and communal areas. There are 15 apartments comprising of 15 No. 2 Beds. spread over levels 01 to level 03. Level 04 is the roof level with all associated communal areas.

Block B – is a mixed-use block covering 5 levels. Level 00 is built up with Amenity area, nurse care, 2x guest aparments, marketing area, refuse, garden store, office, housekeeping area, function room, plant room and communal areas. There are 19 apartments comprising of 19 No. 2 Beds. spread over levels 01 to level 03. Level 05 is the roof level with all associated communal areas.

Blocks C to F – are apartment block covering 4 levels. Level 00 is built up with cycle store, switch and tank rooms plus 1 No 1 Bedroom apartment, 6 No 2 Bedroom apartments and communal areas. There are an additional 24 apartments comprising of 6 No. 1 Bedroom apartments and 18 No. 2 Beds spread over levels 01 to level 03. Level 04 is the roof level with all associated communal areas.

External works – Extensive soft and hard landscaping throughout the aligned with Landscaped Architect designs.

 

Through high performance construction materials, efficient heating and hot water generation via air source heat pump technology, renewable energy generation on site as well as offsetting carbon emissions, the buildings will achieve net zero carbon emissions when in use. A sustainable transport hub will provide cycle hire and electric vehicle charging points.

Set to open in late 2024, the Chester community is part of Retirement Villages’ Thrive Living collection, a new approach to urban and integrated retirement communities which is designed to promote active, independent lifestyles.

  • Scale
    1.6Ha
  • Duration
    111 weeks

Project Gallery

Get in touch

At Elliott Group, we are proud of our exceptional team of professionals who are available to talk to you in person or who can answer any question you might have.

  • Scale
    1.6Ha
  • Duration
    111 weeks